U S E R M A N U A L
NOTE!
See technical specifications for
recommendations.

3.2.5 Standalone / tower installation

WARNING!
To avoid injury from tripping, place
the UPS and EBM enclosures and
run cables where they do not pose a
trip hazard.
DANGER!
Circuits behind display LCD can
create risk of electric shock
if exposed. Do not try to rotate the
display by using hands or tool.
Please refer to chapter 4.6 to
rotate the display.
3.2.5.1 UPS
1. Set up the stabilizer bracket then put the unit
into the stabilizer bracket. (figure 3.2.4.1-1).
3.2.5.1-1
Stabilizer bracket for external battery module
NOTE!
Please install the 4 screws to
ensure that the unit is correctly
placed in standalone/tower
position

3.2.5.2 External battery modules

1. Set up the extension plate as below and install
it on the UPS stabilizer bracket.
2. Install the UPS and EBM individually into the
stabilizer bracket.
3. Connect to the UPS with the battery power
cable (refer to rack position installation).
NOTE!
It is recommended that this unit be
installed to UPS right hand side.
If installing an additional unit, place
it next to the previous unit.
3.2.5.2-1
Stabilizer bracket for external battery module
13