12
WATER CONDENSATION MAY OCCUR IF
THE UPS IS UNPACKED IN A VERY LOW
TEMPERATURE. TO AVOID HAZARDS AND
RISK OF ELECTRIC SHOCK, WAIT UNTIL
THE UPS IS FULLY DRY BOTH INSIDE AND
OUTSIDE BEFORE INSTALLING/USING
THE UPS.
WATER CONDENSATION MAY OCCUR IF
THE UPS IS UNPACKED IN A VERY LOW
TEMPERATURE. TO AVOID HAZARDS AND
RISK OF ELECTRIC SHOCK, WAIT UNTIL
THE UPS IS FULLY DRY BOTH INSIDE AND
OUTSIDE BEFORE INSTALLING/USING
THE UPS.
POWERVALUE 11 RT G2 IN — 1-3 KVA

3.2.4 Rack-mount installation

WARNING!
To avoid injury from falling objects make
sure that the rack cabinet can accept the
UPS weight before installing it, including
provisions for fixing the UPS by screw. It is
recommended to install the battery
starting from the bottom of the rack

3.2.4.1 UPS

Note that you need a rack-mounting kit
(purchased separately) for this operation. This
procedure is suitable for 19-inch rack cabinet
installation with a minimum depth of 800 mm.
Identify the final position and keep 2U spacing
for this installation.
1. Install the ear bracket onto the unit using the
M4 flathead screws (figure 3.2.4-1).
2. Slide the unit into the rail kit and make sure to
tighten the rack-mounting screw
(figure 3.2.4 -3).
3. After installing the UPS into the rack, proceed
with the connection of the load to the UPS.Make
sure the load devices are turned off before
plugging them into the output receptacles.
01
01
3.2.4-1
01
Ear bracket
02
3.2.4-2
Rack rails
02
02
3.2.4-3
Rack-mount installation
03
03

3.2.4.2 External battery modules

WARNING!
Do not pile UPS and EBM enclosures, they
might fall over.
The picture below represents just a
simplified connection diagram.
Identify the final position and keep 2U spacing
for this installation; it is recommended that this
spacing is provided below the UPS.
1. Install the ear bracket onto the unit with the
flathead M4 screw. (figure 3.2.4-1).
2. Slide the unit into the rail kit and make sure to
tighten the rack-mounting screw
(figure 3.2.4-3).
3. Connect the EBM to the UPS with the battery
power cable (figure 3.2.4.2-1).
4. Install fixing plate to fix battery cable
(figure 3.2.4.2-2)
3.2.4.2-1
Battery module connection
3.2.4.2-2
Battery module connection