3 I N S TA L L AT I O N
3 .2 .4
3.2.4.1-1:
Stabilizer bracket for
external battery module
3.2.4.2-1:
Stabilizer bracket for
external battery module
WARNING
DANGER
3 .2 .4 .1 UPS
1.
Set up the stabilizer bracket then put the unit
into the stabilizer bracket. (figure 3.2.4.1-1).
NOTE
3.2.4.1-1

Standalone / tower installation

TO AVOID INJURY FROM TRIPPING, PLACE
THE UPS AND EBM ENCLOSURES AND RUN
CABLES WHERE THEY DO NOT POSE A
TRIP HAZARD.
CIRCUITS BEHIND DISPLAY LCD CAN
CREATE RISK OF ELECTRIC SHOCK IF
EXPOSED. DO NOT TRY TO ROTATE THE
DISPLAY BY USING HANDS OR TOOL.
PLEASE REFER TO CHAPTER 4.6 TO
ROTATE THE DISPLAY.
PLEASE INSTALL THE 4 SCREWS TO
ENSURE THAT THE UNIT IS CORRECTLY
PLACED IN STANDALONE/TOWER
POSITION
3 .2 .4 .2 External battery modules
1. Set up the extension plate as below and install
it on the UPS stabilizer bracket.
2. Install the UPS and EBM individually into the
stabilizer bracket.
3. Connect to the UPS with the battery power
cable (refer to rack position installation).
IT IS RECOMMENDED THAT THIS UNIT BE
INSTALLED TO UPS RIGHT HAND SIDE.
IF INSTALLING AN ADDITIONAL UNIT,
PLACE IT NEXT TO THE PREVIOUS UNIT.
NOTE
11