Stand-Alone / Tower Installation - ABB PowerValue 11 RT G2 User Manual

Hide thumbs Also See for PowerValue 11 RT G2:
Table of Contents

Advertisement

3 I N S TA L L AT I O N
8. Connect internal battery connector, and put
3.2.4.2-5:
the front panel back to the unit.
Battery plug connection
3.2.4.2-6:
Front panel insertion
3.2.5.1-1:
Stabilizer bracket for
UPS
3.2.5.2-1:
Stabilizer bracket for
external batter module
3.2.4.2-5
3.2.4.2-6
9. Turn on the circuit breaker on external
battery bank.
NOTE
3 .2 .5
3 .2 .5 .1 UPS
1. Set up the stabilizer bracket, then put the unit
into the stabilizer bracket. (figure 3.2.5.1-1).
NOTE
3.2.5.1-1
2
1
UP TO SIX EXTERNAL BATTERY
ENCLOSURES CAN BE CONNECTED TO
THE UPS IN THE SAME WAY, AS
SHOWN ABOVE.

Stand-alone / tower installation

PLEASE INSTALL THE 4 SCREWS TO
ENSURE THAT THE UNIT IS CORRECTLY
PLACED IN A STAND-ALONE/TOWER
POSITION.
FOOTSTAND
SCREW M4 x 4
3 .2 .5 .2 External battery modules
1. Set up the extension plate as below and install
it on the UPS stabilizer bracket.
2. Install the UPS and EBM individually into the
stabilizer bracket.
3. Connect to the UPS with the battery power
cable (refer to rack position installation).
PLEASE INSTALL THE 8 SCREWS TO
ENSURE THAT THE UPS AND EXTERNAL
BATTERY MODULE ARE CORRECTLY
PLACED IN A STAND-ALONE/TOWER
NOTE
POSITION.
FOOT EXTEND
3.2.5.2-1
IT IS RECOMMENDED THAT THIS UNIT
BE INSTALLED TO THE RIGHT-HAND
SIDE OF THE UPS. IF INSTALLING AN
ADDITIONAL UNIT, PLACE IT NEXT TO
NOTE
THE PREVIOUS UNIT.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents