U S E R M A N U A L
These products also meet the following product
standards:
Table 1: Standards
Product standards
ESD
IEC 61000-4-2 Level 3
IEC 61000-2-2
Low frequency
Disturbing voltage:10V
signals
RS
IEC61000-4-3 Level 3
EFT
IEC 61000-4-4 Level 4
IEC 61000-4-5 Level 4
Surge
CS
IEC 61000-4-6 Level 3
Power frequency magnetic
IEC 61000-4-8 Level 4
Field immunity
Conducted
IEC 62040-2 Category C2
Radiated
IEC 62040-2 Category C2
VFI-SS-III
Performance classification
Safety
IEC 62040-1:2008+A1+2013
IEC 60068-2-31
Transportation
IEC 60068-2-64
IEC 60068-2-27

1.4 Inquiries

Inquiries regarding the UPS should be
addressed to the local ABB office or agent
authorized by ABB. Note the type code and
the serial number of the equipment before
contacting ABB or authorized agent. The
serial number is shown on the nameplate
of the product. For further information on
troubleshooting, see Chapter 6.

1.5 Installation

WARNING!
Do not connect appliances or
devices which would overload the
UPS (e.g. big motor-type
equipment) to the UPS output
sockets or terminal.
WARNING!
Place cables in such a way that no
one can step on or trip over them.
WARNING!
Do not block air vents in the
housing of UPS. The UPS must be
installed in a location with good
ventilation. Ensure enough space on
each side for ventilation.
WARNING!
UPS is provided earthed terminal, in
the final installed system
configuration, equipotential earth
bonding to the external UPS battery
cabinets.
WARNING!
The UPS can be installed only by
qualified maintenance personnel.
WARNING!
An appropriate disconnect device
as short-circuit backup protection
should be provided in the building
wiring installation.
WARNING!
An integral single emergency
switching device which prevents
further supply to the load by the
UPS in any mode of operation
should be provided in the building
wiring installation.
WARNING!
Connect the earth before
connecting to the building wiring
terminal.
WARNING!
Installation and wiring must be
performed in accordance with the
local electrical laws and regulations.