Lcd Measurement Functions - ABB PowerValue 11 RT G2 IN User Manual

Hide thumbs Also See for PowerValue 11 RT G2 IN:
Table of Contents

Advertisement

U S E R M A N U A L

4.7 LCD measurement functions

Use the "Select"
button to navigate
the display screen.
When the UPS starts
up, the display is in
the default UPS
status summary
screen.
VAC
Input voltage(V)
Select
H
z
Input frequency(Hz)
Select
VDC
Battery voltage(V)
Select
VAC
Output voltage(V)
Select
H
z
Output frequency(Hz)
4.7-1
Display measurement functions
Select
Output current(A)
Select
%
Battery capacity(%)
Select
%
Load percent(%)
Select
Output power(kW)
Select
Output power(kVA)
Select
VDC
Positive bus voltage(V)
VDC
Select
Negative bus voltage(V)
Select
Temperature (°C)
Select
Output receptacle 1
31

Advertisement

Table of Contents
loading

Table of Contents