12
POWERVALUE 11 RT G2 IN — 6-10 KVA

3.2.4 Standalone / tower installation

3.2.4.1 UPS
3 .2 .4
3 .2 .4 .1 UPS
1. Set up the stabilizer bracket then put the unit
1. Set up the stabilizer bracket then put the unit
into the stabilizer bracket.(figure 5).
into the stabilizer bracket.(figure 5).
05
05
Display rotation
12
Standalone / tower installation
7 Stabilizer bracket for
external batter module
11
A B B U P S P R O D U C T S A N D S O L U T I O N S
3.2.4.2 External battery modules
1. Set up the extension plate as below and install
3.2.4.2 External battery modules
it on the UPS stabilizer bracket.
1. Set up the extension plate as below and install
2. Install the UPS and EBM individually into the
it on the UPS stabilizer bracket.
2. Install the UPS and EBM individually into the
stabilizer bracket.
stabilizer bracket.
3. Connect to the UPS with the battery power
3. Connect to the UPS with the battery power
cable (refer to rack position installation).
cable (refer to rack position installation).
06
06
Note:
Stabilizer bracket for external battery module
It is recommended that this unit be installed to
UPS's righthand side.
Note:
If installing an additional unit, place it next to
It is recommended that this unit be installed to
the previous unit.
UPS's righthand side.
If installing an additional unit, place it next to
the previous unit.