Installation; Delivery, Transportation, Positioning And Storage; Unpacking List; Operation Of Ups - ABB PowerValue 11 RT G2 IN User Manual

Hide thumbs Also See for PowerValue 11 RT G2 IN:
Table of Contents

Advertisement

10
POWERVALUE 11 RT G2 IN — 1-3 KVA

3. Installation

3 .1 Delivery, transportation,
positioning and storage
3 .1 .1 Receipt of the UPS and visual inspection
When receiving the UPS, carefully examine the
packing container and the UPS for any signs of
physical damage.
WARNING!
The packing container of the UPS protects it from
mechanical and environmental damage.
To increase protection, the UPS is wrapped in a
plastic sheet. Keep the packaging for later re-use.

3 .1 .2 Unpacking list

After examining the package, open the box and
check the following items are included:
1 x PowerValue 11 RT G2 UPS
1 X USB with complete documentation in
5 languages
Multi-language quick installation guide
2 x UPS stands (support)
4 x M4 hex screw with spring washer
(UPS stands)
4 x M4 pan washer screw (UPS stands)
8 x M4 flat screw (for rack mount ear)
Rack-mount ear
1 x Input power cord-INDIA-IEC C13 cable
(only for 1KB/1KS)
1 x Input power cord-INDIA-IEC C19 cable (only
for 2KB/2KS/3KB)
1 x External battery cable (only for S models)
1 x Fixing plate for battery cable
(only for S models)
1 x USB cable
1 x Terminal Block cover
1 x M16 cable gland (only for 3KB model)
1 x M16 cable gland (only for 3KS model)
Examine the UPS for any signs of damage and
ensure that the received UPS corresponds to the
material indicated in the delivery note. Notify
your carrier or supplier immediately in case of
any damage.
In case of recognizable damage:
Do not connect any voltage to the
unit / Do not put the unit into
operation

3 .1 .3 Operation of UPS

The UPS system contains no user-serviceable
parts. If the battery service life (3~5 years at 25°C
ambient temperature) has been exceeded, the
batteries must be replaced. In this case, please
contact your dealer.
Be sure to deliver the spent battery
to a recycling facility or ship it to
your dealer in the replacement
battery packing material.

3 .1 .4 Storage of UPS

Before storing, charge the UPS 5 hours. Store the
UPS covered and upright in a cool, dry location.
During storage, recharge the battery in
accordance with the following table:
Storage
Recharge
temperature
frequency
-25°C - 40°C
Every 3 months
40°C - 45°C
Every 2 months
Charging
duration
1-2 hours
1-2 hours

Advertisement

Table of Contents
loading

Table of Contents