Site Planning And Positioning; Planning Before The Installation; Positioning; Standalone / Tower Installation - ABB PowerValue 11 T G2 Series User Manual

Table of Contents

Advertisement

10
A B B U P S P R O D U C T S A N D S O L U T I O N S

3 .2 Site planning and positioning

3 .2 .1 Planning before the installation

01 Stabilizer brackets
To ensure a long service life, install the unit
preparation
in a position where any danger to the UPS is
02 Stabilizer brackets
minimized:
installation
• Install the UPS indoors.
• Leave 50 cm of space on each side of the
cabinet to allow cooling airflow and ensure
that the circulation of air to the ventilation
slits is not obstructed.
• Avoid excessively high temperatures and
excessive moisture.
• Make sure that the surface is solid and flat.

3 .2 .2 Positioning

PowerValue 11 T G2 can only be installed in a
standalone configuration.
WARNING
3 .2 .3
3 .2 .3 .1 UPS
1. Place the unit on a flat, stable surface in its
final location.
2. Install 'Stabilizer bracket'(optional): remove
side's screw from the unit, then install
'Stabilizer bracket' to the unit.(figure 1).
3. Install the unit to a surface(optional): place
4pcs bolts(M8 is recommended) to the final
location previously, bolt's position please
refer to below, then fix the unit to the bolts.
WATER CONDENSATION MAY OCCUR IF
THE UPS IS UNPACKED IN A VERY LOW
TEMPERATURE. TO AVOID HAZARDS AND
RISK OF ELECTRIC SHOCK, WAIT UNTIL
THE UPS IS FULLY DRY BOTH INSIDE AND
OUTSIDE BEFORE INSTALLING/USING
THE UPS.

Standalone / tower installation

01
02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powervalue 11 t g2 6 kva bPowervalue 11 t g2 10 kva b

Table of Contents