Service Manual
Operating Lights marLED® E3, E9, E9i, E15, battery and
marLED® E3 on ceiling tube Ø 110 mm
Revision 2
Installing protective grounding
1 Protective grounding
•
Screw protective (PE) conductor (1) in place
with screwdriver.
Fixing cardanic suspension in place
1 Screw clamp
•
Using the screw clamp (1), fix cardanic
suspension in place in its bearing block seat.
Inserting the greased brake screw
1 Brake screw, grease here
•
Grease brake screw (1), then screw it in place.
Checking the cables for correct installation
1 Cardanic suspension
2 Cable with connecting plugs
•
Using your notes, check all cable connections
and fixations for correctness.
•
Reconnect the cables and fix them in place.
93