KLS Martin group marLED E3 Service Manual page 151

Operating lights
Table of Contents

Advertisement

Service Manual
Operating Lights marLED® E3, E9, E9i, E15, battery and
marLED® E3 on ceiling tube Ø 110 mm
c) Checking the locking screws
Check for presence, correct length and suitable pin diameter (4) of the 2 locking screws (2):
AC2000 LC: Locking screws (2) length ≥ 10 mm, Ø pin ≥ 2.5 mm
Onda Space LC: Locking screws (2) length ≥ 21 mm, Ø pin ≥ 2.5 mm
Measure the pin diameter on the location with the smallest diameter.
Replace worn and missing parts.
Install the 2 locking screws (2) with screw lock.
Revision 2
AC2000 LC and Onda Space LC
1 Spring arm sliding sleeve
2 Locking screws
3 Mounting hole of sleeve
4 Brake screw, grease here
AC2000 LC and Onda Space LC
1 Spring arm sliding sleeve
2 Locking screws, grease here
3 Brake screw, grease here
4 Fit of brake screw
151

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Marled e9Marled e9iMarled e15

Table of Contents