KLS Martin group marLED E3 Service Manual page 146

Operating lights
Table of Contents

Advertisement

marLED® E3 as part of a light system
1 Mains cable
2 Central equipotential bonding terminal
Measure the resistance between central equipotential bonding terminal (2) and the locations indicated
in the illustration.
Enter the highest value into the inspection plan.
146
Operating Lights marLED® E3, E9, E9i, E15, battery and
marLED® E3 on ceiling tube Ø 110 mm
3 Measuring instrument
4 Measuring leads
Service Manual
R
= 0.3 Ω
imax
Revision 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Marled e9Marled e9iMarled e15

Table of Contents