Inspection Plan - KLS Martin group marLED E3 Service Manual

Operating lights
Table of Contents

Advertisement

Gebrüder Martin GmbH & Co. KG
KLS Martin Platz 1
D-78532 Tuttlingen/Germany

Inspection plan

Delete as appropriate: marLED
Additional information:
Room/
OR №:
Customer:
Important information!
The test intervals must be observed.
A separate inspection plan must be completed for each terminal device.
Observe the additional information in the Service Manual/Instructions for Use for all inspections.
In case of N/A: If the object is present but cannot be tested, the reason must be indicated in the field Comment)
1. Checking the wall/ceiling assembly
a) Checking the wall/ceiling assembly for stability
b) Checking the tracking arm system for damage
c) Checking the tracking arm system for correct function
2. Checking potential equalization/protective conductor resistance
Measurement acc. to:
Internal resistance between terminal device and central equipotential bonding terminal
on the ceiling tube, max. 0.3 Ω, see fig. "Resistance measurement 1"
Optionally:
Internal resistance between terminal device and externally accessible protective
conductor (measuring point with the highest internal resistance), see fig. "Resistance
measurement 2"
minus resistance between central equipotential bonding terminal and externally
accessible protective conductor, see initial measurement in commissioning protocol
Result (max. 0.3 Ω)
®
V10/V16/E9/E9i/E15/E3 on ceiling tube Ø 110 mm,
®
marLED
E9 battery/E9i battery/E15 battery
one, two, three, four lights, TFT, surgiCam
ceiling, wall, mobile
Others:
IEC 62353
Others:
Light:
Serial №:
Optional
additional
devices:
Company:
OK = okay; Not OK = not okay; N/A = not applicable
OK
Not OK N/A
N/A
Ω
Ω
Ω
Ω

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Marled e9Marled e9iMarled e15

Table of Contents