4.16 Stowing The Jib For Transport - JLG 1200SJP Operation And Safety Manual

Table of Contents

Advertisement

SECTION 4 - MACHINE OPERATION
1.
Place the boom in the stowed position with the turntable
locked.
2.
Remove all loose items from the machine.
3.
Secure the chassis and the platform using straps or chains of
adequate strength and attached to the designated tie down
points.
4-20

4.16 STOWING THE JIB FOR TRANSPORT

1.
Place the boom in the stowed position with the axles
retracted.
2.
Hold the Jib Swing control switch to the right until the plat-
form will no longer swing.
NOTE:
The Jib Swing function is not operable when the Capacity Select
control is in the 1000 lb (454 kg for ANSI markets and 450 kg for
CE and Australia markets) position.
NOTE:
Automatic platform leveling is disabled when stowing the jib.
3.
Push and hold the Jib Stow control switch until the jib and
platform are in the stowed position under the boom.
31215054

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1350sjp

Table of Contents