• Use correct rod size and current settings.
• Do not use electrical cords without ground.
• Do not use electrical tools in water.
• Do not weld to the platform.
• Do not ground through the platform.
• Do not use a high frequency arc starter with TIG welder.

Preparation and Inspection

• Connect ground clamp to metal being welded.
• Ensure there is a good ground connection and observe
proper polarity.

Operation

Start the engine, turn on the generator, then turn on the welder.
See the Miller Welder Owner's Manual (PN 3128957) for more
information.