Preparing For Setup; Pole Mounting Requirements - Supermicro SuperServer E403-9D-16C-IP User Manual

Table of Contents

Advertisement

SuperServer E403-9D-16C-IP User's Manual

2.2 Preparing for Setup

Pole Mounting Requirements

Manpower: Three people
Tools:
Adjustable wrench with diameter 1.3 (32mm)
Phillips #1 and #2 screwdrivers
One breaker that can support 1200W power, with leakage and surge protection
and GFCI. (DIN rail mount)
Measuring tape
Surge protection devices (SPD), DIN rail mount
Shielded dual-conductor cable (16 AWG)
Marking pen
Item
Description
1
Spacer
2
Holding bar
3
Thread rod
4
M3 screw
5
M10 nut
6
Washer
AC-out cable
Thread rod
Accessory Package Items
Quantity
Item
Description
2
7
Spring washer
2
8
M8 nut
4
9
Cable gland
12
10
Hoist ring
4
11
Door key
4
12
AC out cable
L
N
PE
Hoist ring
Figure 2-1. Accessories
20
Quantity
4
8
1
2
2
2
Holding bar
Spacer
Cable gland

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SuperServer E403-9D-16C-IP and is the answer not in the manual?

Table of Contents