Cablescan 512 Instruction Manual page 22

Continuity tester
Table of Contents

Advertisement

Model 512 Instruction Manual
INPUT RANGE
110/220 V~
2A 50/60HZ
SPEAKER
FOOTSWITCH
PROBE
511
J8
512
383
J6
384
255
J4
256
127
J2
128
4
3
1. Connect assembly fixture.
2. Load Program (Figure 8).
3. Connect wrist strap.
4. Connect foot switch.
5. Press SEQ BUILD.
6. Follow the display in making connections. When the From/To point that is displayed is
touched, the tone will sound - as an aid in identifying points. To bypass a step, press foot
switch or the SEQ BUILD key. When the last step has been completed, the display will
show "OK".
7. Press TEST to test for opens and shorts.
Figure 9. Simplified SEQUENTIAL BUILD Procedure
1.6 A/250V
CAUTION!
For continued protection against
risk of fire, replace only with
same type and rating of fuse.
ENABLE
PRINTER
449
447
450
448
321
319
322
320
193
191
194
192
65
63
66
64
1
TERMINAL
385
J7
386
257
J5
258
129
J3
130
1
J1
2
SEQ
RANDOM
ERROR
BUILD
BUILD
LIST
MENU
RUN
5
2
Page 13
6
MODEL 512
TEST
RESET
7

Advertisement

Table of Contents
loading

Table of Contents