Verifying The Switch; Figure 42: Verifying The Switch Id Led - Allied Telesis x330-10GTX Installation Manual

Gigabit layer 3 ethernet switch
Hide thumbs Also See for x330-10GTX:
Table of Contents

Advertisement

Chapter 5: Verifying the Switch

Verifying the Switch

76
After powering on the switch and waiting two minutes for it to initialize the
management software, perform the following procedure to verify its
hardware operations:
1. Examine the Switch ID LED. As a standalone switch, it should be
displaying one of the values in Figure 42, depending on whether the
low power mode is on or off. If the LED is displaying the letter "F", refer
to Chapter 7, "Troubleshooting" on page 85. For more information,
refer to "Switch ID LED" on page 31.
Low Power
Mode Off
Figure 42. Verifying the Switch ID LED
2. Start a local or remote management session on the switch. Refer to
"Starting a Local Management Session" on page 73.
3. Enter the SHOW SYSTEM ENVIRONMENT command in the User
Exec or Privileged Exec mode.
4. Check the Status column. All components should have the "OK"
status.
For information about the command line interface, refer to the
Software Reference for x330 Series Switches, AlliedWare Plus
Operating System on the Allied Telesis web site.
5. Go to Chapter 6, "Cabling the Networking Ports" on page 77.
Low Power
Mode On

Advertisement

Table of Contents
loading

Table of Contents