Calibration 2 Of 2: Power From Rrh 1 Rfhd 2 -> Rrh 1 Rfhd - Keysight Technologies S9100A Startup Manual

5g multi-band vector transceiver
Table of Contents

Advertisement

7 Run Power Calibration
7. 3. 5. 2 Calibration 2 of 2: Power from RRH 1 RFHD 2 -> RRH 1 RFHD 1
1. Calibrate the Source (Tx) signal path
82
This calibration is used to calibrate FR2 ports
(with
RF Tx/Rx 2 ➁
S9100A Option 007 mmWave Transceiver with High IF.
When performing this Power Calibration, the Source (Tx) output
power level is set to -5 dBm by default.
a. Select the Power Calibration tab.
b. Select the Operation drop-down arrow and select
c. Select the Calibration Step(s) drop-down arrow and select
d. Select the Port Selection drop-down arrow and
select
RRH 1 RFHD 2 -> RRH 1 RFHD 1
e. Select
Start the calibration
f. Connect the U8487A Power Sensor or equivalent to
M1740A mmWave Transceiver connector
g. Select
to continue the calibration.
Ok
View the
Results Source
Corrections are stored in:
Tx-RFIO_2-CHANNELPOWER.csv
used as the RF Output) on an
.
and follow the prompts.
RF Tx/Rx 2 ➁
tab when the calibration is complete.
S9100ID_<SerialNumber>-
S9100A 5G Multi-Band Vector Transceiver, Startup Guide
.
Calibration
.
Complete
.

Advertisement

Table of Contents
loading

Table of Contents