7 Run Power Calibration
Before running Power Calibration on mmWave ports, review the following:
1. Review
2. Review
3. Review
How to proceed...
4.
Run S910xA System Calibration Software on page 64
5. Connect Equipment
See
6. Perform Alignments
See
7. Perform Calibration
See
S9100A 5G Multi-Band Vector Transceiver, Startup Guide
Calibration Conditions on page 60
Calibration Equipment Required on page 61
Calibration Connectors (Ports 1 to 8) on page 62
Using the Equipment Tab on page 65
Using X-Apps to Perform Alignments on page 74
Using the Power Calibration Tab on page 75
7 Run Power Calibration
59