7 Run Power Calibration
Before running Power Calibration on mmWave ports, review the following:
1. Review
2. Review
3. Review
How to proceed...
4.
Run S910xA System Calibration Software on page 56
5. Connect Equipment
See
6. Perform Alignments
See
7. Perform Calibration
See
S9101A 5G Multi-Band Vector Transceiver, Startup Guide
Power Calibration Conditions on page 52
Power Calibration Equipment Required on page 53
Power Calibration Connectors (Ports 1 to 6) on page 54
Using the Equipment Tab on page 57
Using X-Apps to Perform Alignments on page 67
Using the Power Calibration Tab on page 68
7 Run Power Calibration
51