Run Power Calibration - Keysight Technologies S9101A Startup Manual

5g multi-band vector transceiver
Hide thumbs Also See for S9101A:
Table of Contents

Advertisement

7 Run Power Calibration

Before running Power Calibration on mmWave ports, review the following:
1. Review
2. Review
3. Review
How to proceed...
4.
Run S910xA System Calibration Software on page 56
5. Connect Equipment
   See
6. Perform Alignments
   See
7. Perform Calibration
   See
S9101A 5G Multi-Band Vector Transceiver, Startup Guide
Power Calibration Conditions on page 52
Power Calibration Equipment Required on page 53
Power Calibration Connectors (Ports 1 to 6) on page 54
Using the Equipment Tab on page 57
Using X-Apps to Perform Alignments on page 67
Using the Power Calibration Tab on page 68
7 Run Power Calibration
51

Advertisement

Table of Contents
loading

Table of Contents