Preparations For Starting Up; Assembling The Equipment Trolley - WAGNER Prima Sprint Airfluid Translation Of The Original Operating Manual

Manual powder system
Table of Contents

Advertisement

VERSION 07/2009
OPERATING MANUAL
5

PREPARATIONS FOR STARTING UP

Incorrect installation/operation!
Risk of injury and damage to equipment
SIHI_0050_GB
5.1

ASSEMBLING THE EQUIPMENT TROLLEY

The manual system's trolley is supplied unassembled for reasons associated with transport.
It must be assembled as described below.
25Nm;
18.44lb ft
P_01153
ORDER NUMBER DOC 2305835
When putting into operation and for all work, read and follow
the operating instructions and safety regulations for the addi-
tionally required system components.
WARNING
Procedure:
1. Open transport packaging with care and
carefully take all single parts out of
2
packaging.
2. Place lower trolley section 1 on a clean, level
surface.
3. Place upper trolley section 2 on the two
guide sleeves on lower trolley section 1,
press down gently until stop is reached and
1
use nuts and bolts (see details) to screw to
lower trolley section (tightening torque
25 Nm; 18.44 lb ft).
Prima
Sprint.
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prima sprint 60lPrima sprint 3l

Table of Contents