Case 845B VHP Operator's Manual page 105

Graders
Hide thumbs Also See for 845B VHP:
Table of Contents

Advertisement

CHAPTER 4 – OPERATING INSTRUCTIONS
Road bed
After preparing the drainage, the next step is to prepare
and level the road bed.
Maintain the frame straight, circle centered and blade al-
most perpendicular to the machine, in such a way that the
material leaves from both sides and cuts the crest of the
road rather high to permit drainage on both sides.
In subsequent passes, angle the blade between 10° and
25° tilting it a little toward the front to permit the material
to roll toward the road shoulders.
Make these passes at relatively high speeds, so that the
loose material passes under the blade before touching
the ends.
On the final pass, for each road shoulder position the bla-
de end bit in line with tandem, so that the rear tires can
compact the material that may slide off the sides of the
blade.
4-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

865b vhp885b vhp

Table of Contents