Maintaining The Vacuum System - Agilent Technologies 5975 MSD Operation Manual

For openlab cds
Hide thumbs Also See for 5975 MSD:
Table of Contents

Advertisement

Maintaining the Vacuum System

Periodic maintenance
As listed earlier in
vacuum system must be performed periodically. These include:
• Checking the foreline pump fluid (every week)
• Checking the calibration vial(s) (every 6 months)
• Replacing the foreline pump oil (every 6 months)
• Tightening the foreline pump oil box screws (first oil change after
• Replacing the diffusion pump fluid (once a year)
• Replacing the dry foreline pump seals (once a year)
Failure to perform these tasks as scheduled can result in decreased
instrument performance. It can also result in damage to your instrument.
Other procedures
Tasks such as replacing a foreline vacuum gauge or Micro-Ion vacuum gauge
should be performed only when needed. See the 5977B Series MSD
Troubleshooting and Maintenance manual and see the online help in
OpenLAB CDS GCMS Acquisition software for symptoms that indicate this
type of maintenance is required. See the 5977B Series MSD Troubleshooting
and Maintenance manual and see the online help in MassHunter GCMS
Acquisition software for symptoms that indicate this type of maintenance is
required.
More information is available
If you need more information about the locations or functions of vacuum
system components, see the MSD Troubleshooting and Maintenance manual
that was shipped with your instrument.
5975/5977 Series MSD Operation Manual
Table 16
installation)
on page 86, some maintenance tasks for the
General Maintenance
4
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

5977 msd

Table of Contents