Agilent Technologies 5975 MSD Operation Manual page 44

For openlab cds
Hide thumbs Also See for 5975 MSD:
Table of Contents

Advertisement

2
Installing GC Columns
10 Tighten the nut 1/4 to 1/2 turn.
11 Check the nut's tightness after one or two heat cycles; tighten additionally
Use care when placing the isolation tip on the end of the GC/MS interface to avoid
CA UT IO N
damaging the column.
12 Install the isolation tip on end of the GC/MS interface. For the EI GC/MS
13 Gently check the alignment of the ion source and the interface tip seal.
Forcing the analyzer door closed if these parts are misaligned will damage the seal or
CA UT IO N
the interface or the ion source, or will keep the sideplate from sealing.
14 You can align the ion source and interface tip seal by wiggling the side plate
15 Close the analyzer chamber door. (See
44
as appropriate.
interface with a standard or inert EI source, a tip seal is not needed.
When the ion source is aligned correctly, the front analyzer chamber can be
closed all the way with no resistance except the spring tension from the
interface tip seal.
on its hinge. If the door still will not close, contact your Agilent
Technologies service representative.
page 125.)
"To Close the Analyzer Chamber"
5977B Series MSD Operation Manual
on

Advertisement

Table of Contents
loading

This manual is also suitable for:

5977 msd

Table of Contents