Download Print this page

OLT SunShed Garden Shed SSGS1212-FJ-METAL Assembly Manual page 42

12x12 with metal roof-fj

Advertisement

89.
Attach both the Horizontal Door Trim (32") with
4 - finishing nails, and Horizontal Narrow Wall Trim (8")
with 2 - finishing nails.
91.
Use 8 - 1 1/2" finishing nails per piece to
secure. Complete Rear.
Plates over Horizontal Gable Trim seam and attach
with 4 - 1 1/2" finishing nails.
Vertical Door Stops
93.
Attach Interior Vertical and Horizontal Door Stops to door framing from inside of shed.
Use 4 - 2" screws to secure each Stop. Stops should overlap door by approx. 1/2"
Toll Free 1-888-658-1658
Attach Facia Detail
www.outdoorlivingtoday.com
Page 42
Angle cut
on 1 end
90.
Locate Horizontal Gable Trims for
both front and rear of shed. Position equally
over gable and wall seam.
92.
Assemble Flower Box Kit with Assembly
Instructions included on Page 44. Position complet-
ed Flower Box below bottom of window trim and
secure with 2 - 2 1/2" screws. Screw from inside of
box into the center wall stud. Attach second screw
2" underneath first screw and once again into the
wall stud. Install Flower Box Kits underneath each
window.
sales@outdoorlivingtoday.com
Horizontal Door Stop

Advertisement

loading