Download Print this page

OLT SunShed Garden Shed SSGS1212-FJ-METAL Assembly Manual page 28

12x12 with metal roof-fj

Advertisement

D. Roof Section
Metal Ridge Caps (3)
Foam Enclosures (Multiple Pieces)
Metal Roof Panels
Long (4)
Batten Spacers Long
15 3/4" (8)
Batten Spacers Short
13 3/4" (4)
Batten flush with
top of Rafter
51.
Starting on the polygal side locate Outside Roof Battens (3/4" thick x 3 1/2" wide x 48 1/4"
long) and place on roof rafters. Place at top of Rafter section where Rafter and Ridge Board meet.
Batten should be positioned evenly on 3rd rafter. Batten will overhang outside Rafter by 2 3/4".
52.
Attach Batten to Rafters with 3 - 1 1/4" screws per Rafter Section. Important: pre-drill with
1/8" drill bit first to prevent end from splitting. Place Inside Roof Batten (45 1/2" long) next to the
first and attach with 3 - 1 1/4" screws. Place Outside Roof Batten next to this inside batten and
attach with 3 - 1 1/4" screws.
Toll Free 1-888-658-1658
Overhangs outside
Rafter by 2 3/4"
Outside Batten
www.outdoorlivingtoday.com
Page 28
Polygal Panels (6)
Roof Battens Inside
45 1/2" (8)
Roof Battens Outside
48 1/4" (16)
Centered on 3rd
Rafter.
Inside Batten
Outside Batten
sales@outdoorlivingtoday.com

Advertisement

loading