Download Print this page

OLT SunShed Garden Shed SSGS1212-FJ-METAL Assembly Manual page 9

12x12 with metal roof-fj

Advertisement

6.
Attach Floor Runners to completed floor
frame. There are 2 floor runners per 136 1/2"
side and 5 completed runners in total. Use
6 - 2 1/2" screws per Runner.
8.
Complete all Floor Runners.
Concrete Slab
Foundation
9.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution: you will need 2 people to assist you. Be careful when laying floor down not to bend or twist
floor. When in place, level floor completely.
Toll Free 1-888-658-1658
7.
Make sure Runners are flush with outside and
front and rear floor framing, not overhanging.
Note: The floor will be flipped over and floor
runners will sit on your foundation.
important to note that having a level foundation
is critical. Choosing a foundation will vary
between regions. Typical foundations can be
concrete pads or patio stones positioned
underneath the floor runners.
www.outdoorlivingtoday.com
Page 9
Foundations
sales@outdoorlivingtoday.com
It is

Advertisement

loading