OLT SunShed Garden Shed SSGS1212-FJ-METAL Assembly Manual page 21

12x12 with metal roof-fj

Advertisement

Completed
Ridge Board.
Important: Pilot
Hole Ridge Board
to prevent splitting!
20.5"
37.
Lay out 9 Rafters, 2 Soffits and the completed Ridge Board from Step 36 on level ground as shown.
Double up Rafters as illustrated. Screw doubled up Rafters together with 3 - 2 1/2" screws.
Note: completed rafter section will be flipped over in Step 39.
Attach completed Ridge Board to ends of both outside rafters with 2 - 2" screws per end. Measure and
position interior Rafters as illustrated above. When positioned correctly, attach Ridge Board to remaining
rafters with 2 - 2" screws /rafter end.
Important: Pilot Hole Ridge Board to prevent splitting.
Attach end of a 68 1/4" long Soffit Board flush to ends of outside rafters with 2 - 1 1/4" screws per rafter
end. Complete both outside Rafter/Soffit connections first. Measure and position interior Rafters as illustrat-
ed above. When positioned correctly, attach Soffits to remaining rafters with 2 - 1 1/4" screws/rafter.
Important: Pilot Hole Soffits to prevent splitting.
Toll Free 1-888-658-1658
Soffit
Important: Measure 20 1/2" spacing accurately
to accomodate Polygal Panels. See Step 65.
Expert Advice: Use Polygal panel to confirm correct
width.
Completed Ridge Board
45.5"
20.5"
20.5"
Soffit
www.outdoorlivingtoday.com
2 1/2" Screws into
Doubled up Rafters.
136.5"
45.5"
20.5"
Page 21
Soffit
45.5"
20.5"
20.5"
Soffit
Important: Pilot Hole
Soffit to prevent splitting!