Download Print this page

OLT SunShed Garden Shed SSGS1212-FJ-METAL Assembly Manual page 25

12x12 with metal roof-fj

Advertisement

44.
Where Ridge Boards meet, press together and secure with 12 - 1 1/4" screws per side. We
recommend using a clamp to hold the Ridge Boards together flush while screwing. Stagger screw
position vertically on Ridge Board to create a stronger connection. Complete both sides.
Important: if there is a gap between Ridge Boards, try pushing side walls closer together from outside.
Walls should be 136 1/2" apart at top from inside of wall plate to wall plate as per Step 43.
45.
With both Rafters Sections correctly aligned,
secure Gable framing to both outside rafters with
8 - 2" screws per side at top and with 6 additional
2" screws into wall top plates at bottom.
Toll Free 1-888-658-1658
Important: If Gable framing does not line up
with Rafters, remove temporary 2" screws
from gable framing. Re-align gable and
secure with 8 - 2" screws total.
www.outdoorlivingtoday.com
Page 25
Advice: It may be helpful
to use a clamp to help hold
Ridge Boards together
flush while screwing.
sales@outdoorlivingtoday.com

Advertisement

loading