Download Print this page

OLT SunShed Garden Shed SSGS1212-FJ-METAL Assembly Manual page 32

12x12 with metal roof-fj

Advertisement

Remove Metal Roof Hangars
61.
Before fully fastening Metal Roof Panels down, remove the Metal Roof Hangars and insert
Foam Enclosures between Metal Roof Panels and Battens at the bottom of the roof.
Enclosures will prevent moisture and unwanted bugs, etc from entering your shed through here.
62.
Using 18 - 2" Metal screws and 1/4" Nut Driver, secure Metal Roof Panels down to
remaining lower 3 rows of Battens. Leave the top row unsecured to secure Ridge Cap in Step 66.
Tighten screws in middle row that were partially attached in Step 60. Do not overtighten!
63.
Move to polygal side of roof and locate Short Metal Roof Panels (39"wide x 41" long).
Space panels as apart as per Step 58 to match opposite side. Short Metal Roof Panels will over-
hang lowest Batten by approximatley 2 1/4". Caulk seams between panels before fastening.Attach
Panels to middle row of Battens with 6 - 2" Metal screws. Note: Metal Hangar brackets do not set
length of short panel side. Use a helper to hold the short panels in place.
Toll Free 1-888-658-1658
www.outdoorlivingtoday.com
Page 32
Screw into center of
Roof Batten
sales@outdoorlivingtoday.com

Advertisement

loading