Energy Probe Operation - ARM DS-5 Manual

Hide thumbs Also See for DS-5:
Table of Contents

Advertisement

12.4

Energy Probe operation

12.4.1
Adding the caiman application to Streamline
ARM DUI 0482K
ID120712
In the Timeline view of Streamline, you can see the Energy Probe data aligned to the software
activity. If your target meets the requirements, and you have attached a power probe point that
closely resembles the activity of the CPU cores using Channel 0, the Streamline correlation
algorithm aligns the data for you. Notes in the warnings tab communicate any limitations or
failures in this area.
When you have set up everything correctly, run a standard report capture and analysis. A large
variance between idle and activity ensures that the correlation algorithm has something to lock
onto, so set your workloads accordingly. If you have connected and configured your Energy
Probe correctly, a power chart now appears in the Timeline view.
To configure Energy Probe, select the ARM Energy Probe option from the Energy Capture
drop-down menu and add the path to the
the run configuration dialog box, under Tool Path. Enter the path name or use the Browse
button to locate the file.
Note
It may be necessary to specify the
following command in the Device field:
Copyright © 2010-2012 ARM. All rights reserved.
Non-Confidential
Figure 12-4 Energy Probe in the Timeline view
application in the Streamline options panel of
caiman
Figure 12-5 The populated Tool Path field
device when using Streamline on Linux. To do so, enter
tty
/dev/ttyACM0
Using the Energy Probe
12-8

Advertisement

Table of Contents
loading

Table of Contents