2
Installation
Installation Checklist
Installation Checklist
10
Accela UV/Vis Detector Hardware Manual
The following checklist summarizes the steps required to install the UV/Vis detector:
Installation step
Unpack and inspect your instrument.
Provide the proper location and environment.
Gather the necessary tools.
Check the power settings and fuses.
Connect and install the LightPipe flow cell.
Make the back panel connections.
Turn on the UV/Vis detector for the first time.
This UV/Vis detector was installed by:
(Name)
Reference page
11
11
12
12
14
25
37
(Date)
Thermo Scientific