Installation Checklist - Thermo Scientific Surveyor PDA Plus Hardware Manual

Table of Contents

Advertisement

2
Installation

Installation Checklist

Installation Checklist
8
Surveyor PDA Plus Detector Hardware Manual
The following installation checklist is a brief summary of the steps that you need to complete
in sequence for the proper installation of the PDA detector.
Unpack and inspect your instrument (see
Read the safety notices in the preface.
Make the initial instrument preparations (see
Check the power settings and fuses (see
Make the initial back panel connections (see
Connect and install the LightPipe flow cell (see
Power on the detector for the first time (see
Install software and connect remote communication outputs, as required (see
Download the PDA detector firmware, if required. See
Configure the Surveyor PDA Plus Detector for control from your chromatography data
system. See
Chapter 3, "Configuration."
Calibrate the Surveyor PDA Plus Detector (see
page
31).
This detector was installed by:
(Name)
page
9).
page
9).
page
10).
page
11).
page
15).
page
19).
Appendix A, "Firmware."
"Calibrating the PDA Detector"
page
19).
on
(Date)
Thermo Scientific

Advertisement

Table of Contents
loading

Table of Contents