PARTS REQUIRED:
x1
OO
TEMPORARY SUPPORT
69" (175,3 cm) Door Stiffener
Install OO flush under panels.
2
Secure to floor frame with (2) 3" screws (Fig. A).
Mark center of door opening.
IMPORTANT NOTE:
You may need to lower and level OO
so that doors will fit under gable panels.
Center doors on mark (Fig. B).
3
Screw hinge boards into wall supports with (10) 3" screws, as shown.
4
Make sure screws go into framing.
Fig. B
3/8"
(1 cm)
Remove temporary support OO and check to make sure doors open and close properly.
FINISH
Your doors are now installed.
Fig. A
OO
Center 3/8" measurement
on mark.
DOORS
x12
Flush
against wall panels
57
3" (7,6 cm)
(2) 3" (7,6 cm) Screws
OO
TEMPORARY SUPPORT
(5) 3" (7,6 cm)
Screws
in door stud