Download Print this page

Heartland VALUE Series Assembly Manual page 59

10' x 10' (304,8 x 304,8 cm)
Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x1
OO
TEMPORARY SUPPORT
69" (175,3 cm) Door Stiffener
Install OO flush under panels.
2
Secure to floor frame with (2) 3" screws (Fig. A).
Mark center of door opening.
IMPORTANT NOTE:
You may need to lower and level OO
so that doors will fit under gable panels.
Center doors on mark (Fig. B).
3
Screw hinge boards into wall supports with (10) 3" screws, as shown.
4
Make sure screws go into framing.
Fig. B
3/8"
(1 cm)
Remove temporary support OO and check to make sure doors open and close properly.
FINISH
Your doors are now installed.
Fig. A
OO
Center 3/8" measurement
on mark.
DOORS
x12
Flush
against wall panels
57
3" (7,6 cm)
(2) 3" (7,6 cm) Screws
OO
TEMPORARY SUPPORT
(5) 3" (7,6 cm)
Screws
in door stud

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stillwater