Download Print this page

Heartland VALUE Series Assembly Manual page 37

10' x 10' (304,8 x 304,8 cm)
Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x32
2" (5,1 cm)
x2
2" (5,1 cm)
BEGIN
1
Remove temporary brace OO from
installed 10' wall.
Place 2nd 14' wall centered on floor.
1" (2,5 cm) overlap is to the bottom.
Reinstall OO as a temporary brace,
as shown.
Secure OO with (2) 3" screws.
ENSURE PANEL CORNERS ARE FLUSH.
2
Secure wall with (1) 2" screw through
gable wall panel into 10' wall bottom
and top plates (Fig. B, Fig. A).
Secure wall to bottom plate first.
3
Nail lower edge of wall panels to floor
frame with 2" nails spaced 6" apart.
Angle nails into floor frame (Fig. C).
Secure wall bottom plates
to floor with 3" nails (Fig. C).
4
Nail 10' eave wall panel to 10' gable wall
stud with 1-1/2" nails spaced 6" apart.
5
Secure wall top plate with (1) 3" screw at the corner at an angle,
as shown (Fig. D).
FINISH
Your 2nd eave wall 04 is now installed.
2nd EAVE WALL 04 INSTALLATION
x1
OO
Temporary Brace
x1
x14
3" (7,6 cm)
1"
(2,5 cm)
Nail 2" nails first.
2" (5,1 cm)
Nails
Fig. C
69" (175,3 cm) Door Stiffener
3" (7,6 cm)
3" (7,6 cm)
Nails
OO
3" (7,6 cm)
Nails
2" (5,1 cm)
Screw
35
x13
1-1/2" (3,8 cm)
3" (7,6 cm)
Screws
Fig. A
3" (7,6 cm)
Screw
Fig. D
Fig. B
2" (5,1 cm)
Screw
Flush
6" (15,2 cm)

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stillwater