Download Print this page

Heartland VALUE Series Assembly Manual page 46

10' x 10' (304,8 x 304,8 cm)
Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
Pre - assembled
BEGIN
1
Measure 3" (7,6 cm) down from top plate doubler and mark at each side as shown.
Set front gable unit centered on front wall doubler. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
Continue securing panels to wall doubler, top plate and rafter with 2" nails spaced 6" apart.
2
Working inside, secure gable unit with (2) 3" screws angled into each FIB at an angle (Fig. A).
3"
NAIL FIRST
(7,6 cm)
2" (5,1 cm)
Measure and
Mark
FINISH
Your front gable unit is now installed.
FRONT GABLE UNIT INSTALLATION
DOUBLER
x4
x57
6"
Fig. A
(15,2 cm)
3" (7,6 cm)
Screws
44
3" (7,6 cm)
2" (5,1 cm)
FIB
3"
(7,6 cm)
Measure and
Mark
NAIL FIRST
2" (5,1 cm)

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Stillwater