PARTS REQUIRED:
BEGIN
Install collar tie to the rafter with (3) 3" nails at each end
1
(Fig. A).
Starting at the wall with the door, install collar tie BE
on the 1st rafter from the gable wall and then on every
other rafter, as shown.
HINT:
For best appearance, install
collar ties on back side of rafter.
FINISH
Your collar tie(s) are now installed.
COLLAR TIE INSTALLATION
BE
1 x 3 x 96" (2,5 x 7,6 x 243,9 cm)
10' x 10'
10' x 14'
5th
3" (7,6 cm)
3" (7,6 cm)
Nails
1st
3rd
1st
3rd
55
10x10' 10x14'
x2
x12
Fig. A
Flush to roof
GABLE WALL
GABLE WALL
x3
x18
panel