PARTS REQUIRED:
x1
OO
Temporary Brace
69" (175,3 cm) Door Stiffener
BEGIN
1
Center 10' wall on the 120" (304,8 cm) floor dimension.
1" (2,5 cm) overlap is to the bottom.
Install OO as a temporary brace.
Secure with (2) 3" screws.
2
Secure lower edge of panel to floor frame with 2" nails spaced 6" apart.
Angle nails into floor frame (Fig. A).
Secure wall bottom plates to floor with 3" nails (Fig. A).
FINISH
Your 10' gable wall 02 is now standing.
10' GABLE WALL 02 INSTALLATION
3" (7,6 cm)
Screws
OO
x10
x2
x23
Flush
Fig. A
29
3" (7,6 cm)
3" (7,6 cm)
2" (5,1 cm)
1"
(2,5 cm)
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
Nail 2" nails first.
2" (5,1 cm)
Nails
6"
(15,2 cm)