iCAP Qnova Series ICP-MS Installation Request Form
Please refer to the iCAP Qnova Series ICP-MS Pre-Installation Requirements Guide (BRE0006946, Revision B) for the complete site
requirements. Circle "Yes" or "No" as to whether the site meets the requirements as specified in that document. Provide the additional
information where requested.
Please note instrument type: 
1:
Yes
No
All laboratory remodeling has been completed and the space available is sufficient to meet the minimum
requirements for the configuration ordered? The floor is certified to meet the load requirements of the system?
2:
Yes
No
Your iCAP Qnova Series ICP-MS instrument has been delivered and is either in the laboratory or can be
delivered immediately on the arrival of the Thermo Fisher Scientific field service engineer?
3:
Yes
No
The key operator will be available during the installation period. The person with the authority to accept the
instrument at the end of the installation will also be available to sign the required acceptance document?
Please provide the names of these individuals:
___________________________________________________________
4:
Yes
No
The entrance to the laboratory and the route from the loading dock are at least 90 cm (36 in) wide with
additional space at corners?
5:
Yes
No
Sufficient bench space is available for all of the equipment? List the following:
Width:______________________Depth:______________________Height:________________________
6:
Yes
No
Workbench can support the load of the system including optional equipment and is free from vibration?
7:
Yes
No
Main power is installed and in compliance with local electrical codes?
Yes
No
The power outlets are of the correct configuration?.
8:
Yes
No
The electrical power for instrument and fore vacuum pump has been measured?
9:
Please note the type of country cable kit required: ________________________________________
10:
Yes
No
Additional power outlets are available for the fore vacuum pump and other peripherals?
11:
Yes
No
Air conditioning is adequate for temperature, humidity, and particulate matter control? The laboratory can be
maintained at a constant temperature, between 15 and 35 °C (59 and 95 °F)?
12:
Yes
No
The relative humidity is between 20% and 80%, non-condensation and non-corrosive atmosphere?.
13:
Yes
No
All gases required are on site, gas lines are installed, and appropriate gas regulators are available?
List gases and purity:_________________________________________________________________
14:
Yes
No
A hydrogen sensor is installed in the vicinity of the instrument (iCAP RQ 2-channel instruments)?
15:
Yes
No
An ammonia sensor is installed in the vicinity of the instrument (mandatory for iCAP TQ/TQs instruments)?
Is there a suitable exhaust system present that is separate from solvent waste? Exhaust lines must be provided for
16:
Yes
No
the instrument exhaust and the plasma exhaust.
17:
Yes
No
Provision has been made for collecting solvent waste? A suitable waste container is provided?
There is a functional telephone close to the system? Phone number ______________________________
18:
Yes
No
19:
Yes
No
All required chemicals and equipment for installing the system are on site?
20:
Yes
No
All relevant local safety regulations have been met and the equipment installed will not affect compliance?
21:
Yes
No
Have any special acceptance specifications been agreed within the contract?
22:
Yes
No
Is there any additional equipment that needs to be interfaced to the system?
I
the undersigned, confirm that the site requirements as stated above have been accomplished and the laboratory is prepared for
,
the installation of the Thermo Scientific, iCAP Qnova Series ICP-MS instrument. I understand that I may be liable for a Thermo
Fisher Scientific field service engineer's travel or lodging expenses if they are unable to carry out the installation on the
pre-scheduled date due to insufficient lab preparation. If circumstances warrants, Thermo Fisher Scientific will make every effort
to reschedule an installation as soon as possible with the next available representative.
Signed: ________________________________________ Print Name: _________________________________________
Company name: _________________________________ Email: _____________________________________________
Date: __________________________________________ Phone: ______________________________________________
Fax to:
Attn: Local Thermo Fisher Scientific field service engineer
Note After we receive this checklist, your local Thermo Fisher Scientific field service engineer will contact you to schedule installation. ▲
Please note voltage (instrument):_____________________Volts AC line to ground.
Please note voltage (fore vacuum pump):____________________Volts AC input to neutral.
If YES, please attach full details of specification.
If YES, please supply details.
iCAP RQ - 1-channel instrument
iCAP RQ - 2-channel instrument
iCAP TQ instrument
iCAP TQs instrument

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icap rq icp-ms

Table of Contents