Site Preparation
Dimensions and Weights
CAUTION
2-6
iCAP Qnova Series ICP-MS Pre-Installation Requirements Guide (P/N BRE0006946, Revision B)
7. Fasten the clamp (3 in
Figure
2-4) with washers (2 in
shown in
Figure
2-3. Fasten the second clamp with the second pair
of screws and washers to the second handle.
8. Repeat for the second lifting devices at the other side of the
instrument.
Make sure that the device is aligned parallel to the side of the
instrument. Check that the lifting device is tightly attached to the
handles.
The ends of the lifting devices must be aligned with each other as
shown in
Figure
2-5.
Labeled Components: 1=lifting device (2 ×), 2=transport pallet, 3=front of
system
Figure 2-5. Lifting devices attached to instrument (top view)
Top Heavy Load. The mass spectrometer might tip over while being
moved in the laboratory and cause bodily injury or instrument
damage. The instrument's center of gravity is indicated in
the instrument has a tendency to tilt. When lifting the instrument,
support the top of the instrument and keep the tilt angle below
5 degrees; never exceed 10 degrees..
9. Lift the instrument on command. Make sure that all carriers lift off
the instrument simultaneously to prevent uneven load distribution.
Figure
2-4) with the two screws (1 in
Figure
2-4) at each side of a hole as
3
1
2
center of gravity
Figure
2-5:
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icap rq icp-ms

Table of Contents