Thermo Scientific iCAP Qnova Series Pre-Installation Requirements Manual page 88

Table of Contents

Advertisement

Index: I–T
system
3-5
helium
5-9,
5-20
humidity
3-6
I
installing, the system
6-3
instrument
failures
1-1
placing
2-9
power supply
4-2
repair
1-1
weight
2-2
instrument arrival
6-2
interface pump
2-11
isolation/noise suppression transformer
K
key operator
6-3–6-4
L
laboratory
altitude
3-6
chairs
6-9
coats
6-9
floor space
2-10
lighting
6-5
particulate matter
6-5
laboratory temperature
3-2
lifting the instrument
2-6
lighting, in the laboratory
M
magnetic fields
3-7
maintenance techniques
6-4
monitor
heat generation
3-5
location
2-12
N
noise reduction cover
2-10
O
operating environment
6-5
operator's responsibilities
1-1, 3-1, 4-1, 5-1, 6-3–6-4,
oxygen
5-14,
5-25
I-2
iCAP Qnova Series ICP-MS Pre-Installation Requirements Guide (P/N BRE0006946, Revision B)
6-7
6-5
6-8
P
packing materials
6-9
particulate matter
air flow
6-5
dust
6-5
smoke
6-5
plasma
exhaust
3-3
gas pressure regulator
5-7,
polystyrene foam cups
6-9
power
conditioning
6-7–6-8
monitoring
6-6
quality
4-8,
6-5
sags and surges
6-5
slow average
6-5
supply quality
6-6
transients
6-5
power conditioner
4-2
power monitoring
supply quality
6-6
voltage disturbances
6-6
power requirements
4-2
pressure
two-stage gas regulator
5-12,
preventive maintenance
6-4
Q
quality of power
4-8,
6-5
R
radio frequencies
3-7
recirculating chiller
heat generation
3-5
technical data
5-4
room temperature, fluctuation
S
shipment terms
6-2
smoke
6-5
solvent, for cleaning
5-29
static electricity
6-9
system
dimensions and weights
heat generation
3-5
system reliability
3-2
T
technical assistance
6-8
5-18
5-23
3-6
2-2
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icap rq icp-ms

Table of Contents