Thermo Scientific iCAP Qnova Series Pre-Installation Requirements Manual page 52

Table of Contents

Advertisement

Consumables
Gas Supply iCAP RQ ICP-MS
NOTICE
5-6
iCAP Qnova Series ICP-MS Pre-Installation Requirements Guide (P/N BRE0006946, Revision A)
5
4
Labeled Components: 1=additional gas 1 inlet, 2=additional gas 2 inlet,
3=argon gas inlet, 4=CCT2 inlet, 5=CCT1 inlet
Figure 5-5. Gas connection at the left of iCAP RQ 2-channel system
Depending on the number of additional gas modules installed, the gas
connection plate may look different.
Table 5-3
lists the connector types for the gases.
Table 5-3.
Gas connections at iCAP RQ ICP-MS
Label
Connection
Argon
push-in fitting
Add 1
push-in fitting
Add 2
push-in fitting
a
CCT
bulk head union
b
CCT 1
bulk head union
b
CCT 2
bulk head union
a
iCAP RQ ICP-MS - 1-channel system
b
iCAP RQ ICP-MS - 2-channel system
2
1
3
Tubing/ Capillary
6 mm OD
6 mm OD
6 mm OD
1/16" OD
1/16" OD
1/16" OD
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icap rq icp-ms

Table of Contents