3. Remove the four clamps that fix the instrument to the transport
pallet, see
Figure
2-2.
4. Hold the lifting device so that the yellow label on the lifting device
which advises users to read the manual is visible. Place the lifting
device on top of the handles, with the two ends of the twice bent
tube pointing toward the instrument.
5. Position the correct holes in the metal sheet of the lifting device
above the handles of the instrument, see
right side of the
instrument
(seen from the front)
Figure 2-3. Positioning the lifting device above the handle of the
instrument
Each lifting device consists of a folded metal sheet with holes and a
twice bent tube. It is delivered with four hexagon screws, four
washers, and two clamps.
6. To mount a lifting device onto the handles at one instrument side,
place a clamp(3 in
toward
mass
Labeled Components: 1=hexagonal screw (4 ×), 2=washer (4 ×), 3=clamp (2 ×)
Figure 2-4. Lifting device, exploded assembly drawing view
iCAP Qnova Series ICP-MS Pre-Installation Requirements Guide (P/N BRE0006946, Revision B)
Figure
2-4) below each of the two handles.
Site Preparation
Dimensions and Weights
Figure
2-3.
left side of the
instrument
(seen from the front)
1
2
3
2-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icap rq icp-ms

Table of Contents