Test Next Pile - Novatest ZBL-U5 Series Instruction Manual

Ultrasonic detectors
Table of Contents

Advertisement

Manual for ZBL-U5 series of Ultrasonic Detector
Press Analyze button in this interface to return to
of acoustic shadow graph (as shown in Figure 4.13)
acoustic shadow graph may switch to check interface of flat test.

4.3.7 Test next pile

After one pile has been tested, user must create a new pile at first
for testing next pile: In dialogue box of parameter setup, press New
button after foundation pile name; refer to Section 4.2.1 for more
details.
System will clear current data and create new pile file
automatically; before clearing, it will check that whether current data
have been saved. If current data have not been saved yet, prompt box
inquiring "data has been changed, save or not" will pop up, press Yes
Figure 4.14 Oblique test check interface
68
drawing interface
;Sliding toward right in

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zbl-u5100Zbl-u5200Zbl-u5300

Table of Contents