Preventive Maintenance - Lippert Components Ground Control TT Installation And Owner's Manual

Leveling onecontrol touch panel
Hide thumbs Also See for Ground Control TT:
Table of Contents

Advertisement

Preventive Maintenance

1. For optimum performance, the system requires
full battery current and voltage. The battery MUST be
maintained at full capacity.
2. Check the terminals and other connections at the
battery, the controller, and the jacks for corrosion, and
loose or damaged connections.
3. Remove dirt, road debris and grease from jacks as
needed. Then lightly lubricate the jack screw and wipe
off any excess lubrication, leaving only a thin coating.
lci1.com
574-537-8900
Ground Control
Leveling OneControl
Touch Panel
Installation and Owner's Manual
(For Aftermarket Applications)
Notes
35
CCD-0002700
TT
®
®
(3K-5K)
Rev: 03.02.21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

799870

Table of Contents