C.2.5 Power–Up And Test - Cabletron Systems CSMIM2-16 Installation Manual

Communications server module
Table of Contents

Advertisement

C.2.5
Power–up and Test
The following instructions describe the power–up and test sequence to
verify that the port upgrade was successful:
1.
Reconnect all the cables.
2.
Connect a terminal to the console port (port 1).
3.
Plug the CSMIM2-32 into the MMAC, apply power.
4.
Set CSMIM2-32 to Setup mode by pressing the Setup switch on the
front panel. The S/U indicator should light.
Press the Setup switch within 3 seconds of powering–up.
NOTE
5.
The CSMIM2-32 runs its ROM–resident power–up diagnostics:
All indicators light momentarily and then turn off.
The Traf indicator flashes to show that diagnostics are running.
If the diagnostics complete successfully, the Stat and Attn
indicators light. After about one minute, the ROM Monitor prompt
appears on the console terminal.
6.
Issue the config command to verify the new hardware and port
configuration.
If the config command indicates that the CSMIM2 has 32 ports, then the
installation was successful.
CSMIM2 Installation Guide
CSMIM2-16UG Upgrade Kit
C-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csmim2-32

Table of Contents