Pre-Maintenance Procedures; Preparing For Maintenance; Removing The Battery Cover; Opening The Hood - Toro Reelmaster 3100-D Operator's Manual

Hide thumbs Also See for Reelmaster 3100-D:
Table of Contents

Advertisement

Pre-Maintenance
Procedures

Preparing for Maintenance

1.
Park the machine on a level surface.
2.
Lower the cutting units.
3.
Engage the parking brake.
4.
Shut off the engine, and remove the key.
5.
Wait for all parts to stop moving.
Removing the Battery
Cover
Remove the 2 knobs that secure the battery cover to
the machine, and remove the cover
Figure 53
1. Knob

Opening the Hood

1.
Release the latches at the left side and right side
of the hood
(Figure
Figure 54
1. Hood latch
2.
Rotate the hood up and back
(Figure
52).
2. Battery cover
53).
(Figure
54).
g336164
g336542
44
Figure 55
g336543

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 031704092100000317003171

Table of Contents