Pre-Maintenance Procedures; Preparing For Maintenance; Opening The Hood - Toro Reelmaster 5610-D Operator's Manual

Hide thumbs Also See for Reelmaster 5610-D:
Table of Contents

Advertisement

Notation for Areas of Concern
Inspection performed by:
Item
Date
1
2
3
4
5

Pre-Maintenance Procedures

Preparing for Maintenance

1. Park the machine on a level surface, disengage the PTO, lower the cutting units, and
engage the parking brake.
2. Shut off the engine, remove the key, wait for all moving parts to stop, and allow the
engine to cool.

Opening the Hood

Release the 2 hood latches
hood.
Maintenance: Pre-Maintenance Procedures
Information
and rotate open the
Page 6–5
G424259
3464-486 A

Advertisement

Table of Contents
loading

This manual is also suitable for:

03956

Table of Contents