Notation for Areas of Concern
Inspection performed by:
Item
Date
1
2
3
4
5
Pre-Maintenance Procedures
Preparing for Maintenance
1. Park the machine on a level surface, disengage the PTO, lower the cutting units, and
engage the parking brake.
2. Shut off the engine, remove the key, wait for all moving parts to stop, and allow the
engine to cool.
Opening the Hood
Release the 2 hood latches
hood.
Maintenance: Pre-Maintenance Procedures
Information
and rotate open the
Page 6–5
G424259
3464-486 A