4. Starting up
WARNING : Before switching on the Inomotion control module, to avoid any hardware dam-
age, it is imperative to set the lower "MIN POS" and upper "MAX POS" operating limits on the
module
(see § 5.3.2 page
When starting up the Inomotion, each axis will automatically position itself on its reference
point, at the low electrical stop for the Inorecip V, and at the front for the Inorecip H
4.1. Tools
The tools listed below are recommended for installation and maintenance of the equipment.
• Flat and Phillips screwdriver.
• Allen wrenches.
• Flat and pipe wrenches.
• Multi-grip and cutting pliers.
• Stepladder.
4.2. Installation
The position of the Inorecip V having been defined in accordance with the installation of the
powder booth, the following connections and adjustments are made:
4.2.1. Installation of the rail frame on the floor
Inorecip V must be installed on a flat floor with a
resistance of 40 daN/cm
WARNING : it is imperative to respect the mini-
mum distance of 350 mm between the Inorecip
V and the inside of the powder booth.
Fix the rail frame to the floor with 6 M10 screws.
Index revision : A
28).
2
.
Out of explosive
atmosphere
Rail frame
Vis M10
16
Zone 22
1000
350 mini
7140